Portfolio

Energy · In development

Cheyenne Battery Storage

Grid-service storage at a substation to provide balancing energy and peak shaving.

Project

The Cheyenne Battery Storage facility is being connected directly to an existing substation and provides 120 MWh of storage capacity. The facility serves to provide grid balancing services and to smooth out generation peaks from the group's wind and solar farms. Commissioning is scheduled for 2028.

Highlights

  • 120 MWh storage capacity
  • Connection to existing substation
  • Balancing energy and peak shaving
  • Commissioning in 2028

Gallery

Inside the project

Images from planning, construction and operation. Click any image to view it full size.

Investor inquiry

Interested in this project?

Request the project summary or talk to us about a participation, a co-investment or a joint next step.

Reference

Cheyenne Battery Storage

  • A reply, as a rule, within two business days
  • Project documents after a short confidentiality check
  • Your details are never passed on to third parties