Energy · In development
Cheyenne Battery Storage
Grid-service storage at a substation to provide balancing energy and peak shaving.
Project
The Cheyenne Battery Storage facility is being connected directly to an existing substation and provides 120 MWh of storage capacity. The facility serves to provide grid balancing services and to smooth out generation peaks from the group's wind and solar farms. Commissioning is scheduled for 2028.
Highlights
- 120 MWh storage capacity
- Connection to existing substation
- Balancing energy and peak shaving
- Commissioning in 2028
Gallery
Inside the project
Images from planning, construction and operation. Click any image to view it full size.
Related projects
More from Energy
Energy · Carbon County, Wyoming
Carbon Ridge Solar Park
Open-space facility with a 15-year PPA and designated expansion area for storage.
180 MWp
Nominal Capacity
Energy · Campbell County, Wyoming
Powder River Wind Farm
42 wind turbines with a long-term power purchase agreement and in-house operational management.
240 MW
Installed Capacity
Investor inquiry
Interested in this project?
Request the project summary or talk to us about a participation, a co-investment or a joint next step.
Reference
Cheyenne Battery Storage
- A reply, as a rule, within two business days
- Project documents after a short confidentiality check
- Your details are never passed on to third parties
