Business area 02 · Energy that lasts
Renewable Energy & Infrastructure
From land securing to grid feed-in: we develop, finance and operate generation and storage assets.
- Installed capacity
- 2,140 MW
- Sites
- 31
- Avoided emissions
- 1.4 M t / year
- Investment volume
- USD 1.5 billion
Starting point
The energy transition is not a project but an infrastructure task. Crownstone develops wind and solar farms, battery storage and grid-adjacent infrastructure in regions with high resource quality and reliable grid access.
We accompany each asset through its entire life cycle: land securing, permitting, construction, grid connection, operations and repowering. Long-term power purchase agreements secure revenue; in-house technical monitoring secures availability.
Capabilities
- Wind and solar project development
- Grid connection and permitting management
- Power purchase agreements (PPA) and direct marketing
- Technical operations and monitoring
Market and opportunity
Wyoming is among the regions with the best wind and solar resources in the United States. At the same time, demand for firm capacity and storage is growing as the share of volatile generation rises. Whoever secures land, grid access and permits early creates value that cannot be copied at short notice.
Economic stability comes from long-term power purchase agreements. We negotiate terms of 15 to 20 years with creditworthy offtakers and calculate revenue risk conservatively, even where market prices fluctuate.
- 2,140 MW
- Installed capacity
- 31
- Sites in operation and construction
- 97.4 %
- Technical availability
- 15–20 years
- Offtake agreement terms
Focus areas
Where we invest
Onshore wind
Wind farms with long-term secured land, modern 5 MW-class turbines and full operations management.
Solar & ground-mounted
Ground-mounted photovoltaics, complemented by agrivoltaic concepts and rooftop arrays on our own real estate.
Battery storage
Grid-serving storage projects that smooth generation peaks and provide balancing capacity.
Grid & substations
Stakes in substations and connection infrastructure that bring generation and consumption together.
Differentiators
What sets us apart in this area
01
Land securing in one hand
Origination, contract structuring and local acceptance work are led by our own teams. That shortens routes and reduces dependencies.
02
Permitting expertise
Environmental review, species protection and grid connection are the critical paths. We run them in parallel with our own specialists and external advisers.
03
In-house operations
Technical operations run through the group's own operating company with round-the-clock remote monitoring.
04
Integrated marketing
Direct marketing, offtake agreements and storage marketing are managed centrally, as part of the portfolio rather than as individual trades.
Process
From first site to ongoing operation
Every phase is owned by our own teams. That applies to all three areas: different specialists, the same standard of control.
- 01Land securingLong-term lease agreements with landowners and municipalities, including local acceptance work.
- 02PermittingEnvironmental review, species protection and building law, led by our own permitting specialists.
- 03FinancingProject financing with equity backing and long-term offtake agreements.
- 04Construction & connectionTurnkey construction and grid connection within fixed schedule and cost frames.
- 05Operations & repoweringTechnical operations, remote monitoring and timely modernisation of the assets.
Portfolio
Projects in this area
A selection from the current portfolio and ongoing developments.
Energy · Cheyenne, Wyoming
Cheyenne Battery Storage
Grid-service storage at a substation to provide balancing energy and peak shaving.
120 MWh
Storage Capacity
Energy · Carbon County, Wyoming
Carbon Ridge Solar Park
Open-space facility with a 15-year PPA and designated expansion area for storage.
180 MWp
Nominal Capacity
Energy · Campbell County, Wyoming
Powder River Wind Farm
42 wind turbines with a long-term power purchase agreement and in-house operational management.
240 MW
Installed Capacity
Frequently asked
What investors ask us most
How long does a wind or solar project take?+
From land securing to commissioning typically takes four to six years. Permitting and grid connection set the timetable, not construction.
What happens if subsidies disappear?+
We market through long-term offtake agreements and direct marketing. A subsidy framework is not the basis of our calculations.
Does Crownstone involve municipalities and residents?+
Yes. We inform early about plans, seek local dialogue and examine voluntary contributions to host municipalities.
How are the assets maintained?+
Through our own operating company with remote monitoring, plannable maintenance windows and a spare parts concept for critical components.
Investor inquiry
Talk to us about energy.
Would you like to review documents, assess a project or discuss a co-investment? Send us your inquiry and we will come back with the right information and a dedicated contact.
Reference
Renewable Energy & Infrastructure
- A reply, as a rule, within two business days
- Project documents after a short confidentiality check
- Your details are never passed on to third parties